Ilmenau photovoltaic system, Thuringia / Germany
In December 2020, the last of the 1950 solar modules for our 750 kWp roof system were installed in Ilmenau, Thuringia. The connection to the grid is scheduled for May 2021. A second construction phase with approx. 1,000 kWp is planned for the second half of 2021.